BLUF: FusionServer V5 stopped accepting new orders on 30 June 2023, so anything you buy as “V5” today is new old stock (NOS) or refurbished — not current production. That does not make it a bad buy. The 2288H V5, the volume model, is still a 2U dual-socket platform with 24 DDR4 DIMM slots, up to 3 TB of memory and 20 × 3.5-inch or 31 × 2.5-inch drive bays, which is more than enough for virtualization, backup, file serving and edge workloads. What makes or breaks a V5 purchase is not the model name — it is the configuration lock: PSU wattage and revision, drive cage type, RAID card and supercap, BMC firmware level, LOM/OCP network card and rail kit. Get those pinned in writing before you pay, and a V5 fleet will run for years. Skip that step and you will be hunting a discontinued riser in three months.
1. What “V5 and earlier” actually covers
The naming is confusing because the brand changed while the product line did not. Huawei built and sold the FusionServer x86 rack line (RH2288 V3, 1288H V5, 2288H V5, 5885H V5 and so on). In 2021 the x86 server business was carved out into xFusion, which continued the same FusionServer family and the same V-generation naming. xFusion itself describes its launch as 2021 and its product line as the continuation of that business.
Practical consequence for a buyer: a “V5” can carry either a Huawei or an xFusion badge and be the same hardware generation. Documentation, BMC firmware and spare parts all key off the model + generation, not the logo on the bezel. That is good news for sourcing — the installed base is large — and bad news for anyone who assumes the badge tells them the age of the machine.
| Generation | CPU platform | Memory | PCIe | Typical models | Commercial status |
|---|---|---|---|---|---|
| V3 (Huawei-badged) | Xeon E5-2600 v3/v4 | DDR4 2133/2400 | PCIe 3.0 | RH2288 V3, RH1288 V3 | Long past EOL, secondary market only |
| V5 | 1st/2nd Gen Xeon Scalable, up to 205 W (2288H V5; per model varies) | 2288H V5: 24 × DDR4, up to 3 TB. 1288H V5 also has 24 slots but a lower ceiling; the V5 product pages are now offline, so we quote the 2U model and do not extrapolate across the family | PCIe 3.0 | 1288H V5, 2288H V5, 2488H V5, 5288 V5, 5885H V5 | EOM 30 June 2023 (new orders closed) |
| V6 | 3rd Gen Xeon Scalable (Ice Lake), up to 270 W | 2288H V6: 32 × DDR4 at 3200 MT/s, 12 TB (official). 1288H V6 has 32 slots too, but xFusion publishes no maximum capacity for it — its page banner says 12 TB while the spec table gives only slot count, so we quote the 2U figure only | PCIe 4.0 | 1288H V6, 2288H V6, 2488H V6, 5288 V6 | End-of-sale cycle, still widely available |
| V7 / V8 | 4th/5th Gen Xeon Scalable, Xeon 6 | 32–64 × DDR5 | PCIe 5.0 | 1288H V7, 2288H V7, 5885H V7, 1288 V8 | Current generation |
Sources: xFusion product pages and datasheets for V5/V6/V7; xFusion EOM notice dated 30 June 2023 covering the V5 rack family.
2. The 30 June 2023 line — and what it changes
End of marketing (EOM) means the vendor stops accepting new orders, including orders for expansion capacity. After that date the only supply is channel inventory, NOS and the secondary market. Three things follow, and they matter more than the spec sheet:
- Configurations are fixed. You can no longer order a specific chassis/PSU/RAID combination from the factory. Whatever exists in the channel is what exists. If your deployment standard is “2288H V5, 12 × 3.5-inch cage, 900 W Platinum, RAID with supercap”, the market may only hold two of those four in quantity.
- NOS is finite and ageing. Factory-sealed V5 units built in 2022–2023 have been sitting in storage. Seals are good; electrolytic capacitors and RAID cache batteries still age. Ask for the build date from the BMC or the label, not the invoice date.
- Spare parts economics improve, then worsen. For the first years after EOM the secondary market is deep and cheap because decommissioned fleets feed it. Later, specific FRUs (risers, drive backplanes, PSUs of one wattage) dry up and the remaining stock gets expensive.
3. The V5 numbers that still decide fit
The 2288H V5 is the volume model and the one most overseas buyers actually receive. Verified from the vendor datasheet:
| Item | FusionServer 2288H V5 |
|---|---|
| Form factor | 2U, 1 or 2 sockets |
| CPU | Full-series Intel Xeon Scalable (1st/2nd Gen), up to 205 W, up to 28 cores per CPU, UPI up to 10.4 GT/s |
| Memory | 24 × DDR4 DIMM, up to 3 TB (128 GB DIMMs); supports 12 × Optane PMem 100 series + 12 × DDR4 for up to 7.5 TB total |
| Local storage | 20 × 3.5-inch or 31 × 2.5-inch SAS/SATA; 4/8/12/24/28 NVMe; 2 × M.2 |
| PCIe | 10 slots (PCIe 3.0) |
| Network | 2 × GE + 2 × 10GE LOM on board |
| PSU | 900 W Platinum (AC), redundant 1+1 — from the September 2020 vendor datasheet; the current official product page no longer lists the V5 PSU line-up, so confirm the actual part per unit |
| Management | iBMC with Redfish/SNMP/IPMI 2.0, HTML5 KVM |
One naming caution before the numbers: 2288H V5 and 2288 V5 are not the same machine — the non-H 2288 V5 takes 16 DDR4 DIMMs and 2 TB, while the 2288H V5 takes 24 DIMMs and 3 TB. If a listing says “2288 V5” without the H, the memory ceiling you are planning against may be wrong.
Two things are worth flagging to anyone comparing V5 against a current V7. First, the memory ceiling is per-DIMM-generation, not per-slot — 3 TB assumes 128 GB DDR4 LRDIMMs, which are now scarce and priced accordingly; a realistic 2026 V5 build lands at 512 GB–1 TB with 32/64 GB RDIMMs. Second, PCIe 3.0 is the hard ceiling on the platform. Modern 25/100 GbE NICs will run, but at PCIe 3.0 x16 you are leaving bandwidth on the table, and NVMe drives are capped by the same bus.
4. Where V5 still earns its rack space
V5 makes sense when the workload is stable, I/O-light and capacity-heavy:
- Backup targets, archive tiers and object storage nodes where sequential throughput matters more than IOPS per core.
- Virtualization clusters on 2nd Gen Xeon Gold where the guest density is already known and does not need to grow.
- File/print, DNS/DHCP, monitoring, CI runners, lab and staging environments.
- Cold or warm DR sites where the machine mostly idles.
V5 does not make sense when:
- You need 3rd Gen+ features (PCIe 4.0, SGX enclaves, DDR4-3200 efficiency curves) or vendor-certified support on a current OS release.
- The workload is latency-bound transactional database work that benefits from per-core IPC gains of two generations.
- You need a factory warranty or OEM service entitlement — you will not get one on an EOM platform, from us or from anyone else.
- Rack power or density is the constraint: a V5 at 900 W PSU pair and 2U gives you fewer cores per U than V7.
5. The configuration lock: six things to pin before you pay
This is the part that separates a fleet purchase from a one-off gamble. Ask for all six in writing, per unit, with photos of the labels:
- PSU wattage and revision. 900 W Platinum is the common V5 unit, but mixed pairs exist in the field. PSUs are the most-replaced part on any 5+ year platform; you want the same part number across the fleet so one spare fits all.
- Drive cage and backplane type. 8 × 2.5, 12 × 3.5, 25 × 2.5 and NVMe cages are different backplanes. A “2288H V5” with a 12 × 3.5 cage cannot be converted to 25 × 2.5 without a new backplane, cables and often a different RAID card.
- RAID card model and cache protection. Card model determines max drive count and whether you need a supercap or battery. Cache protection modules age — a 2019 supercap is a consumable, not a feature.
- BMC/iBMC firmware level. Firmware is downloadable from the vendor support site, but very old levels can block upgrade paths. Record the current level and confirm the upgrade path to a supported release.
- LOM/OCP networking. Onboard 2 × GE + 2 × 10GE is standard on the 2288H V5; if your design needs 25 GbE, that is a PCIe card and it competes for the 10 slots.
- Rails, bezel and cable management arm. Trivial until you are installing 20 units and discover the rail kit is model-specific and no longer produced.
> Rule we apply on our own quotes: if a V5 unit cannot be documented on all six points, we quote it as a chassis with unknown configuration and price it accordingly — we do not present it as a deployment-ready node.
6. Firmware, OS support and the honest limits
Firmware and drivers for the V5 family are published on the vendor support portal, and the OS compatibility matrix is queryable per model. Practically:
- Linux: RHEL 7/8, SLES 12/15, Ubuntu 18.04/20.04, CentOS 7/8 and openEuler were certified on V5. CentOS 8 is end-of-life upstream; if you are standardising now, plan for Rocky/Alma or a vendor-supported RHEL subscription rather than CentOS.
- Windows Server: 2016/2019 are the realistic targets on 1st/2nd Gen Xeon Scalable. Newer releases may install but certification is not published for the platform — verify per SKU before committing (marked as to be verified in our own documentation).
- VMware: ESXi 6.7/7.0 were the certified releases; 8.x support on 2nd Gen Scalable is limited and CPU-model dependent. Confirm against the VMware HCL for your exact CPU, not the model name.
- Security patching is the real expiry clock on V5 — not the hardware. Once your hypervisor stops shipping microcode-adjacent fixes for that CPU generation, the platform’s risk profile changes regardless of how healthy the chassis is.
7. Sourcing routes and what each one costs you
| Route | What you get | Strength | Risk |
|---|---|---|---|
| Decommissioned enterprise fleet (bulk, one owner) | Matched configs, often with rails and original drives | Homogeneous fleet, known history, best price per node | Drives usually wiped or removed; mixed firmware; sold as-is |
| Channel NOS / sealed overstock | Factory-sealed units with build dates | Sealed; 3-year warranty on the unit from us | Limited configurations; storage-ageing on caps and batteries |
| Refurbisher / broker mixed lots | Single units, any config | Fast availability for odd parts | No fleet consistency; condition language varies wildly |
We ship from China to global destinations and quote against the exact configuration you specify. For fleet orders we confirm the six lock points per unit before invoicing, and we will tell you when a requested combination simply does not exist in the market rather than substitute silently.
Comparing platform families rather than generations? The trade-offs between FusionServer and PowerEdge for buyers in emerging markets — pricing bands, spare-part depth and where the long-tail configurations actually come from — are set out in our xFusion versus Dell comparison for China sourcing.
8. Condition, warranty and the language we use
- New and factory-sealed NOS units: 3-year warranty backed by us, written on the order confirmation and counted from our delivery date — not from the factory build date or any remaining manufacturer entitlement.
- Refurbished: 1-year warranty from Beijing Xinchuan Technology Co., Ltd.; tested and graded by us, not re-graded by the vendor.
- Storage and spare parts ordered separately: 1 year — a mixed order carries two clocks.
- Refurbished hardware is never presented as new, and no manufacturer warranty or OEM service entitlement is claimed on secondary-market equipment. We are an independent supplier and exporter, not an OEM channel.
- Every quote states condition explicitly: new sealed, NOS, or refurbished with cosmetic and functional grade.
If a seller offers you a “V5 with factory warranty”, ask which factory and which entitlement — on an EOM platform the honest answer is a third-party warranty, and it should be in writing.
FAQ
Is FusionServer V5 still supported by the vendor?
The platform reached end of marketing on 30 June 2023, meaning no new orders. Firmware, drivers and documentation remain published on the support portal, but you should not expect new feature releases. Service entitlement depends on the individual unit’s original contract and cannot be transferred by a secondary-market seller — treat vendor service as unavailable and plan your own spares.
What is the difference between a Huawei-badged and an xFusion-badged V5?
Generation and hardware are the same; the brand changed when the x86 server business was carved out in 2021. Documentation and firmware are keyed to model and generation, so a Huawei-labelled 2288H V5 and an xFusion-labelled one are serviced the same way. Do not pay a premium for the badge.
Can I upgrade a V5 to V6 or V7 by swapping parts?
No. V5 uses 1st/2nd Gen Xeon Scalable with DDR4 and PCIe 3.0; V6 moves to Ice Lake with PCIe 4.0; V7 moves to DDR5 and PCIe 5.0. Different sockets, memory, backplanes and power design. Treat generations as separate platforms.
How much memory can I realistically put in a V5 today?
The datasheet ceiling is 3 TB with 128 GB DIMMs, but those modules are scarce and expensive in 2026. Most builds we quote land at 384 GB–1 TB using 32/64 GB RDIMMs. If you need more than 1 TB per node, the cost comparison against a V6/V7 node usually flips.
What should I inspect first on a used V5?
BMC event log, PSU part numbers and hours, RAID supercap/battery date, drive backplane part number, and firmware level. Those five tell you more about remaining life than cosmetic grade. Our inspection and intake routine covers the full checklist, and if you already have a bill of materials, send it through the quote request form and we will confirm what is actually obtainable.
Sources
- xFusion, FusionServer 2288H V6 product page and technical specifications — https://www.xfusion.com/en/product/rack-server/fusionserver-2288h-v6
- xFusion / Huawei FusionServer Pro 2288H V5 datasheet, September 2020 (24 DDR4 DIMM, 3 TB, 20 × 3.5-inch / 31 × 2.5-inch, 10 × PCIe 3.0, 900 W Platinum, 205 W CPU) — the V5 datasheet is the only vendor source for the PSU line-up; the current product page covers V6/V7 only
- xFusion, V5 rack family end-of-marketing notice, 30 June 2023
- xFusion, EU value program configuration listings for 2288H V5 (24 DIMMs, 900 W Platinum PSU) — https://www.xfusion.com/minisite/en/2022eu-value-program
- xFusion corporate launch timeline (2021) — https://www.xfusion.com/en/news/xfusion-explorer-2026
Related reading on this site: the parts side of this generation is covered in our discontinued-platform spare parts guide, the platform lifecycle logic is in our EOL vs EOSL breakdown, and if you are buying xFusion alongside Dell in the same rollout, the mixed-brand purchase model is explained in multi-brand server sourcing on one PO. PSU selection and redundancy sizing is covered in the PowerEdge PSU guide — the same sizing logic applies to 900 W FusionServer units.